Verigy 93k Tester Manual File
: Engineers use SmarTest to define "test flows" and "test suites." These organize how the hardware interacts with the Device Under Test (DUT).
| Tester Model | Recommended Manual Version | | --- | --- | | Verigy 93K (pre-2012) | V4.4 to V5.1 | | Advantest V93000 (2012-2018) | V6.x to V7.5 | | Advantest V93000 (current) | V8.x, V9.0 |
The Verigy 93K tester consists of the following hardware components:
Verigy 93K Tester Manual: A Comprehensive Guide to the V93000 SoC Test System verigy 93k tester manual
: Ensure proper connection of "air input" (utility box), power cables for the test head (STH/CTH), and Workstation Ethernet before powering up. hardware pinout for a particular card? V93000 Technical Documentation - Advantest
The environment for creating, debugging, and executing test programs.
Ensure the liquid cooling unit is on and showing normal pressure. : Engineers use SmarTest to define "test flows"
Uses an eclipse-based Integrated Development Environment (IDE) with a centralized database instead of disconnected text files. 3. Core Component Files & Configurations
If you need help optimizing specific sections of your test program, please let me know:
Understanding the hardware is crucial before diving into the manual. The V93000 is a test system designed for maximum flexibility. verigy 93k tester manual
Checks for open or short circuits on signal pins. The PPMU forces a small negative current (e.g., ) and measures the voltage drop. A reading between indicates a healthy protection diode. Leakage Testing (
An operational V93K workspace consists of several interdependent files:
The manual covers advanced wafer probing techniques, allowing the platform to bring the performance of final package testing into the wafer probing environment. This is critical for minimizing high-speed interface degradation during probing. 3. High-Speed and Performance Testing (HSIO)
93k Tester 02 Hardware Overview Rev.7.2.2.A.00 | PDF - Scribd
Dedicated modules for providing precise power to the SoC.